Large copy of diagram in Appendix 2: Top-dressing airstrip standards and specifications

The items numbered below correlate with the numbers on the diagram above
- Airstrip width - Minimum 30m
- Runway width - Minimum 15m
- All stock removed (cattle 2 weeks prior to operation)
- Loading area
- Wind indicator
- Drop down fence at end of strip
- Dry free flowing fertiliser (Covered bin)
- Strictly no admitance to work area
Strip Length: Please check strip length requirements with your aerial operator. Fertiliser application costs will increase on airstrips of marginal length due to the need to carry smaller loads.
Contents | Back to text