SECTION 6: PARTICULAR SCAFFOLDS AND SCAFFOLDING STRUCTURES - Continued

6.11 Mast-climbing work platforms

Mast-climbing work platforms are available for use as either freestanding units or in single or multiple tower configurations. Mast climbers are progressively tied to the building or supporting structure as they are erected.

When working with mast climbers:

Figure 84: Mast climbing work platform.
Figure 84: Mast climbing work platform

6.12 Barrow ramps

Barrow ramps are a particular type of sloping platform. They contain cleats alongside an uncleated board or channel. This allows wheelbarrows or wheeled loads to be moved easily while guarding against slipping.

Figure 85 shows a typical barrow ramp erected using tube and fitting scaffold. Note the uncleated middle plank for the wheel of the wheelbarrow to run up and down.

Figure 85: Barrow ramp.
Figure 85: Barrow ramp

For heavy loads such as wheelchairs or concrete laden wheelbarrows gradients of about 1:12 are appropriate. The maximum recommended slope for a cleated barrow ramp is 20 or 1 in 3.

6.13 Falsework or propping

Falsework or propping is used primarily to support a load. It is any temporary structure used to support a permanent structure while it [the permanent structure] is not self supporting.

6.13.1 Types of load

Dead Loads (self weight): The actual weights of the falsework structure, permanent materials (precast, concrete) and stored items (plant).

Live Loads (construction activity): The weight of personnel, impact e.g. heaping of concrete, and tools (small plant).

Environmental Loads (wind, earthquakes etc): Load added by environmental factors such as weather, earthquakes, etc.

Calculating total loading

When calculating floor loads for falsework the general loading used for live loads is 2kN/m (205kg/m). This is added to the combined dead load to give total loading and covers most applications outside the most severe weather conditions.

6.13.2 Units and loadings

Table 12: Measurement units and symbols
Physical Properties Unit Symbol
Length Metre m
Mass Kilogram kg
Area Square metres m
Volume Cubic metres m
Density Kilograms per cubic metre kg/m

The mass of a 1 metric tonne (1,000kg) exerts a force of approximately 9.81kN (kilo Newton). Therefore:

1kg exerts a force of approx 9.81N (Newton)

100kg exerts a force of approx .981kN

To covert kg to N: #kg multiplied by 9.81

To convert N to kg: #N multiplied by 0.102

Table 13: Loadings on scaffold
General loading
Sand dry/wet 1680 kg per m/ 1920 kg/m
Timber pinus/m 400 - 480 kg
Water per litre 1.0 kg
Concrete wheel barrow approx 0.05m 136 kg
Blocks concrete (400 x 200 x 200) 19 kg per block
Worker average 100.0 kg
Mass of concrete kg/m
Average 2300
Heavy 3200
Average with 3% steel 2550

6.13.3 Falsework design

When designing falsework establish:

In determining what information to consult and how to approach falsework design, no single document provides all the answers. Sources of information for scaffolders, chartered and design engineers include:

6.13.4 Standard falsework components.

Always follow the manufacturer's instructions and specifications, in particular the maximum safe working loads permitted.

Uhead jack and basejacks
Adjustable props

Adjustable props consist of four parts:

Prop sizes range from 1050mm to 4900mm and can support a safe working load between 8kN (815 kg) and 42.5kN (4335kg) - 32kN (3265kg) on average. Refer to the manufacturer's specifications for safe working loads. Props must be adequately laced in one direction but preferably in two directions. It is recommended that lacing be positioned one third of the distance up the prop inner

Shoreload frames

Traditionally shoreload frames are 1220mm wide and range from 610mm high to 1830mm high. They are constructed from 60mm OD tube and give a safe working load of between 80kN (8160kg) and 100kN (10195kg) per frame. The shoreload frames are connected with frame braces of different lengths to form a tower. Frames can be stacked vertically on top of each other utilising frame joiners to give the desired height (see figure 86).

Figure 86: Typical shoreloading set up.
Figure 86: Typical shoreloading set up

Header beams

A number of beams may be used in falsework, including:

6.13.5 Concrete components

6.13.5.1 Precast

A concrete structure e.g. beam, panel, double T that is poured and set before being brought to the site. The precast can be pre-stressed in the case of shell beams and flat slabs. These traditionally only require propping to support the intended loads.

6.13.5.2 In situ

Concrete poured on site. This traditionally requires propping with primary and secondary beams to enable boxing to be formed to contain the concrete.

Basic propping can be used following the manufacturer's specifications. If there is any doubt concerning ground capacity, loadings etc you must get a chartered engineer to check the design and follow his/her recommendations. Falsework or propping should always maintain a factor of safety of 3 in all aspects of the design.

Traditional scaffolding (tube and fitting, kwikstage system, cuplock, rapid scaff and timber to name a few) can be used for propping. You must follow the manufacturer's specifications in all cases.

Please refer to the section on foundations. While propping is primarily to support a load, it also transfers it to the surface below - to the foundations. Thus, foundations are imperative when propping. In particular the ground capacity and seating of soleboards or bearers must be sufficient for the intended loads

Figure 87 shows how beams should be positioned in Uhead jacks (or similar) to keep the beam centred over the standard or support. The jacks must be rotated against the beam to centre the beam over the standard, prop or similar. The Uhead jack, prop, or similar must then be wedged or chocked to centralise the beam before being placed under load.

Figure 87: Positioning of Uhead jacks or similar.
Figure 87: Positioning of Uhead jacks or similar

6.13.6 General falsework workmanship

The following are critical factors of falsework workmanship on site:

Importance of detail

Constant emphasis is laid on the importance of careful attention to detail. Falsework usually consists of a comparatively large number of members to produce a supporting structure with multitude connections and junction conditions. The stability and integrity of the supporting structure should not be jeopardised by incorrect assembly of one of the many connections or junctions. Failure to get details right during the initial erection of the falsework could lead to local instability and may endanger the entire falsework structure.

Checking falsework

When dealing with falsework, check:

Checking adjustable props

6.14 Timber scaffolds

This section deals with standing scaffolds that comprise standards, ledgers, guardrails and putlogs made of timber.

Quality of timber and fittings

Radiata pine and Douglas fir are suitable timbers for use in timber scaffolding and must be either No 1 framing grade or standard building grade as specified in NZS 3631:1978 Classification and grading of New Zealand timber. Other types of timber may be used if they are of equivalent strength and quality.

All timber used in scaffolding should be preservative treated in accordance with an appropriate commodity specification of the Timber Preservation Authority. Commodity specification C7 is suitable for external scaffolding except when standards and sole plates are in direct contact with the ground in which case it is necessary to treat to commodity specification C3. For indoor scaffolding boron-treated timber is satisfactory. Untreated timber may be acceptable if the timber is sound and unlikely to deteriorate during the life of the scaffold.

Fittings used for connecting joints between standards ledgers and braces must be of adequate strength and be maintained in good condition.

Specific requirements

The design and construction of timber scaffolding for the support of both light-duty and heavy-duty working platforms must be carried out in accordance with sound engineering and trade practices and conform to appropriate New Zealand Standards. The requirements for single-standard (pole) light-duty scaffolds with putlogs cleated to wall or frame and for use up to 5m high are summarised below (see also figures 88 and 89):

Standards: 100mm x 50mm with a maximum spacing of 2.4m.

Putlogs: 150mm x 25mm or 100m x 50mm for a maximum span of 1.2m or 2/150mm x 25mm for a maximum span of 1.5m.

Bracing: Each standard must be tied to the wall by a putlog and braced longitudinally by a ledger and at least two diagonal braces for the length of the scaffold. An additional diagonal brace at 40 to 50 slope must also be provided for every 20m length of scaffold. The minimum size of the brace is to be 100mm x 50mm or 150mm x 25mm.

Guardrail and midrail: Minimum size 100mm x 50mm.

Kickboards: All timber scaffolds must have kickboards on all platforms

Platform width: A minimum of 675mm wide.

Figure 88: Single standard light-duty timber scaffold – general structure.
Figure 88: Single standard light-duty timber scaffold – general structure

Figure 89: Single standard light-duty timber scaffold - connection point detail.
Figure 89: Single standard light-duty timber scaffold - connection point detail